Dry separation
Belgorod Oblast, city of Gubkin, OAO KMAruda Works. A method for dry magnetic separation capable of extracting magnetic inclusions from so-called mining waste, which are currently left unrecovered, is slated for introduction at plot No. 1 of the crushing and enrichment factory.
According to preliminary calculations by specialists, around 600 tonnes of waste will be processed each 24 hours. Dry separation was used previously at the factory, and after reviewing several options, the decision was taken to restore it in the form in which it had existed previously. The extracted magnetic product will be sent for further technological processing. As a result, losses during concentrate production will be successfully minimized.