В этом браузере сайт может отображаться некорректно. Рекомендуем Вам установить более современный браузер.

Chrome Safari Firefox Opera IE  
Все страницы
MainPress-centerPress-releases

Butovskaya mine construction

22 May 2012

Koks Group announces a new belt conveyer commissioning at Butovskaya mine.

A new belt conveyer has been put into operation at the conveyer coal heading A-7 of the Butovskaya mine (а subsidiary of LLC Koks-Mining). Unlike the scraping transporters SR-70 which was used at the mine before, this new belt conveyer will be operated with higher productivity rates and longer operational life. A continuous overburden transportation system is functioning now in the mining face thus contingency situations there will be reduced to the minimum. The investments to the belt conveyer acquisition is more than RUB 50 million.

Back to the list
'bitrix:form.result.new' is not a component